Basic Design Prebid engineering & PMC of 890 MLD Capacity & 855 KM of Water Pipeline up to 96″ and two Pumping Stations, HV Switchgear, 69 Custody Transfer Metering skids, HYSIS Simulation, Hydraulics, Pipeline Sizing & Route analysis, Technical Bid Evaluation (TBE) of EPC Bidders, EPC Cost Estimate, Risk Analysis & Mitigation, Value Engineering, ICSS & SCADA System.

